Related pages
It's taken a long time for the extension to be fully equipped. First the new control room was brought into use cable by cable, studio by studio. Headsets have replaced candle stick telephones. It's all bright and spacious with large windows but in many ways reflects what we left behind in the sub basement.

The front bench is still there with two switchboards and the ATOMs desk is behind it. The jackfields have been banished away to the left and rows of monitoring buttons and silver locking keys to drive the selectors face the operators. The "bays" of the old control room have become Control and Monitor positions to our left and round to the right are two cubicles, each containing a 3 channel control position and a "Despatch Position". This despatch position is really 4 single channels each feeding a Foreign News Manager on the 3rd floor and handling the associated conference circuits.
The TOM overlooks it all from a spacious office and in the far corner are the OB equalising area and the TV switching position. Just beyond and accessed from a lobby area lie mixer 1A, which is used for sport and the four continuities. It's amazing what you can do with relays and Home, Light or Third can be switched to the spare con, instantly changing over all outputs, cue feeds, check receivers and telephone lines.
We'll return to the continuity area shortly but let's look at the rest of the extension. News and sport have moved to the 3rd floor from Egton, the studios there becoming EG1, 2 and 3.

Apart from the TV switching centre and a comms area the extension is an office building, at least above ground.



