Broadcasting House in 1932 Broadcasting House in 1932
Sub Basement - Services - 1
Views of the boiler room, the lift motors and the circuit breaker.

Pumps Lift Motors
above -
Lift motors and controls. The lifts were the fastest moving in London.

right -
Main power input circuit breaker. The power was supplied by the St. Marylebone Borough Council on six separate feeders (3-phase), three at high-tension 6,600 volts, and three at 240 volts between each phase and neutral.
Boiler Room
above -
A corner of the boiler room, showing hot water circulating pumps, hot water storage tank and calorifier.

top left -
A detail of one of the hot water domestic supply pumps.
Circuit Breaker
Broadcasting House in 1932 Broadcasting House in 1932
Sub Basement - Services - 1